Henderson Hall – Cpl Terry L. Smith Gymnasium

Owner: US Department of the Navy
Client: Allen & Shariff Construction
Consultants:
Adtek Engineers, Inc. – civil and structural engineering
SRBR Engineers, Inc. – mechanical/electrical/plumbing engineering
Hughes Associates, Inc. – fire protection engineering
Description: In a Design/Build partnership with Allen & Shariff Construction, Symmetry First designed two connecting structures (650 and 1200 square feet) and a thorough renovation of three existing gym/fitness buildings (26,800 square feet). This construction has taken the three separate buildings and transformed them into one integrated complex. The connecting structures feature translucent skylights to let in natural light and ramps to render the three different floor elevations handicap accessible.
Read More »