HENDERSON HALL - ZEMBIEC POOL

Address: Arlington, VA

Client/Owner: US Department of the Navy

In a Design/Build partnership with Allen & Shariff Construction, Symmetry First designed renovations to the existing pool house and the addition of a Collapsible Air Dome over the pool. The new construction provides the Marines with a swimming / training facility that can be utilized year‐round.


Consultants:

Adtek Engineers, Inc. ‐ Civil and Structural Engineering
SRBR Engineers, Inc. ‐ Mechanical/Electrical/Plumbing Engineering
Hughes Associates, Inc. ‐ Fire Protection Engineering


Actual Construction Cost: $1,684,418
Construction was completed in 2009.